
The METRO Project
感谢您选择 Automatic Translation。目前,我们提供从英语到法语和德语的翻译,不久的将来还会增加更多翻译语言。请注意,这些翻译是由第三方人工智能软件服务生成的。虽然我们发现这些翻译大部分都是正确的,但并非每种情况下都完美无缺。为确保您阅读的信息正确无误,请参考英文原文。如果您发现翻译中有错误,希望引起我们的注意,请告诉我们,这将对我们大有帮助。我们一旦发现任何文字或章节有误,都会及时更正。如有任何翻译错误,请及时与我们的网站管理员联系。
The report compiles the results from the METRO-project. The different parts of the project; design fires, evacuation, integrated fire control, smoke control, extraordinary strain on constructions and fire- and rescue operations are presented separately. The most complicated and expensive part of the project was the performance of the large scale fire and explosion tests in the Brunsberg tunnel.