17 Dec 2020
The CTIF Tunnelfire Working group met virtually
zh-hans
自动翻译免责声明
感谢您选择 Automatic Translation。目前,我们提供从英语到法语和德语的翻译,不久的将来还会增加更多翻译语言。请注意,这些翻译是由第三方人工智能软件服务生成的。虽然我们发现这些翻译大部分都是正确的,但并非每种情况下都完美无缺。为确保您阅读的信息正确无误,请参考英文原文。如果您发现翻译中有错误,希望引起我们的注意,请告诉我们,这将对我们大有帮助。我们一旦发现任何文字或章节有误,都会及时更正。如有任何翻译错误,请及时与我们的网站管理员联系。
CTIF Tunnel Fire Working Group - Virtual Meeting December 17th 2020.
08.00 – 11.00 (Central European Time.)
Agenda:
- Minutes from the last WG meeting in Haugesund.
- Project Haugesund: ”Time of survival inside a vehicle in a tunnel fire. How much smoke come into the vehicle.”
Per Arne Lindvik, Norway.
- Presentation – Ziegler. Fabian Schmidt/Zivko Grcic.
Topics from last meeting. Discussion.
- Tunnel fire projects – Sharing of information.
- Specifications of work/technics in tunnel fires. Experiences from the countries.
- Use of ventilation/fans in tunnel fires.
- Tunnel Fire incidents the last year.
- Constructions of tunnels.
- How many persons and fire trucks normally respond to a tunnel fire. Peter Søe, Denmark
- Language problems – tunnels between countries. Peter Søe, Denmark.
Ole J. Hansen
Preliminary Secretary Tunnel Fire/Vice president CTIF